乱中年女人伦av二区_国产极品美女高潮无套在线观看_人人妻人人澡人人爽偷拍台湾_高清熟女国产一区二区三区 _国产在线乱码一区二区三区_日韩a人毛片精品无人区乱码_中文无码不卡的岛国片_大香伊蕉国产av_9 9久热RE在线精品视频_色舞月亚洲综合一区二区

Technical Support
FAQ
What is different between Low Pressure Molding and Epoxy Potting?

PA Hot melt LPM

Epoxy molding

Case

Need

Meed case

Working temperature

-70~150℃

180℃

Housing

No need housing

Need housing

Cycle time

2-60 seconds

Chemical reaction needs 24 hours

density

0.98

Above 1.2

Curing

Much less curing time

Need curing

Working space

Occupy less space

Occupy large space

Energy consumption

Low

High

Resin consumption

Less

Much more

Process

Simple

Complex

Vacuum pumping

No need

Need 

Hits:  UpdateTime:2018-09-14 15:08:00  【Printing】  【Close